By 1812Blockhouse, ODOT
It will likely come as no surprise, but there are a particularly large number of new developments in the coming week concerning road work taking place in north central Ohio.
This is a weekly report from ODOT District 3 highlighting road construction projects which are beginning or underway in the multi-county area it serves. What follows are posted projects taking place within Ashland, Crawford, and Richland Counties.
Please stay safe and pay attention to these closures and work taking place during the week beginning on June 12. All outlined work is weather permitting.
All the best for safe travels throughout 2022!
U.S. Route 30 Reduced Conflict U-Turn – U.S. 30, just west of Township Road 1255, will have single lane closures for intersection improvements by installing a reduced conflict U-turn. The U-turn configurations are now in operation. SR 603 southbound and northbound are open to traffic. Motorists will have a right-in and right-out turn movement from SR 603 to U.S. 30. There will be NO left-hand turn movements and the median is closed to traffic. U.S. 30 eastbound and westbound will have daytime lane closures as needed to complete work. A minimum of one 12-foot lane in each direction will be maintained. Estimated completion of entire project: August 2022
U.S. Route 250 intersection improvements – U.S. 250 at the SR 89 intersection will have lane closures for an intersection improvement project. The project will improve the intersection sight distance by lowering a crest vertical curve to the west of the intersection and widen the radii at the intersection to better accommodate truck turns.
CONTINUING IMPACTS
Estimated completion: September 2022
U.S. Route 250 roundabout – U.S. 250, at the SR 60/Faultless Drive intersection, will have lane closures for a roundabout project. This project will convert a two-way stop-controlled intersection into a single-lane roundabout. The slip ramp for U.S. 250 north is closed per project plans. There will be no detour. Estimated completion: September 2022
U.S. Route 30 resurfacing – U.S. 30 eastbound and westbound, from SR 602 to just east of SR 61, will have single lane closures for a resurfacing project. Estimated completion: September 2022
State Route 39 culvert replacement – State Route 39, just north of SR 98, is closed for a culvert replacement. The detour route for northbound motorists will be SR 39 to SR 98, southwest on SR 98 to SR 602, north on SR 602 to SR 103, east on SR 103 to SR 39, and reverse for southbound motorists. Estimated completion: Friday, June 17, 2022
State Route 598 minor widening – State Route 598 in the city of Galion, from Carter Drive to Brandt Road, will have lane closures for temporary pavement and drainage work.
CONTINUING IMPACTS
Estimated completion of entire project: October 2022
State Route 602 major reconstruction – State Route 602, between County Route 330 (Old Lincoln Highway) and SR 96, is closed for 60 days for full-depth pavement reclamation project. One-way local traffic will be maintained. The detour route for southbound traffic will be SR 602 to SR 96, west on SR 96 to SR 98, south on SR 98 to U.S. 30, east on U.S. 30 to SR 602, and reverse for northbound motorists. Estimated reopening: Friday, August 5, 2022 (Estimated completion of entire project: October 2022)
U.S. Route 30 major rehabilitation – U.S. 30, from State Route 309 to just east of the 5th Avenue ramps, will have single lane closures for a major rehabilitation project. Traffic will always be maintained.
NEW IMPACTS
CONTINUING IMPACTS
Estimated completion of entire project: May 2023
State Route 39 city of Shelby streetscape project – SR 39, SR 96, and SR 61 are a part of the sidewalk installation and streetscape improvements in the city of Shelby.
CONTINUING IMPACTS
Estimated completion for entire project: June 2022
I-71 bridge painting – NEW IMPACTS – I-71 northbound and southbound at the structures over the Fork River, just north of the I-71/SR 39 interchange, will have lane closures for bridge painting and other various structure repairs. Estimated completion: September 2022
(Updated 6/10/22)
State Route 603 culvert replacement – NEW IMPACTS – State Route 603, between Vermillion Street and SR 545, will close Monday, June 13 for a culvert replacement. The detour route for northwest motorists will be SR 603 to SR 545, north on SR 545 to SR 96, west on SR 96 to SR 603, and reverse for southeast. Estimated completion: Friday, June 17, 2022
State Route 430 culvert replacement – State Route 430, between Esley Lane and Melody Lane, is closed for a culvert replacement. The detour route for eastbound motorists will be SR 430 to SR 39, southeast on SR 39 to SR 603, north on SR 603 to SR 430, and reverse for westbound motorists. Estimated completion: Friday, June 10, 2022
Ohio Department of Transportation, road projects
Comments RSS Feed