ASHLAND
U.S. Route 42 bridge replacement – U.S. 42, between SR 89 and Township Road 553, will have single lane closures for a bridge replacement project.Traffic will be maintained at all times using temporary traffic signals. Lane widths will be reduced to 10’ through the work zone.
NEW IMPACTS
- Township Road 543 is closed for 75 days. The detour route will be TR 543 to TR 1275 east to TR 593 to U.S. 42, and reverse. Estimated reopening: Saturday, September 21, 2024
Estimated completion of entire project: October 2024
U.S. Route 42 & State Route 302 intersection improvement – The U.S. 42 and SR 302 intersection will be converted from the current two-way stop-controlled intersection into a single lane roundabout.
CONTINUING IMPACTS: Current Phase 1 Construction
- SR 302 eastbound direction, from U.S. 42 to Township Rd 251/1080 intersection, remains closed for construction on the new roundabout. The intersection at U.S. 42 and SR 302 remains open, so motorists are able to travel along U.S. 42 during this phase of construction.
- Access on SR 302 will be maintained for residents only. All residents and emergency personnel will need to enter the zone from SR 302 westbound.
- Phase 1 work will approximately last from April 2024 till August 2024.
- The detour route for all other motorists will be SR 302 west to SR 301 north to U.S. 224 west to SR 58 south to SR 302, and reverse.
Estimated completion of entire project: October 2024
Interstate 71 bridge repairs – I-71, at various locations between U.S. 30 and SR 301, will single lane closures in both directions for bridge repairs. Traffic will be maintained at all times. Estimated completion: September 2024
State Route 89 & State Route 302 intersection improvement – The SR 89 and SR 302 intersection will be converted from the current two-way stop-controlled intersection into a single lane roundabout.
CONTINUING IMPACTS: Current Phase 2 Construction
- The SR 89 and SR 302 intersection is closed for 60 days to construct the remaining roundabout at this intersection. Detour routes:
- Local detour: SR 89 north to U.S. 42 east to SR 301 north to U.S. 224 west to SR 58 south to SR 89, and reverse.
- All other motorists: SR 302 west to SR 301 north to U.S. 224 west to SR 58 south to SR 302, and reverse.
- Estimated completion of Phase 2: Friday, August 2, 2024
- This is phase two of the project and will approximately last from June 2024 till August 2024.
Estimated completion of entire project: October 2024
U.S. Route 224 culvert replacement – NEW IMPACTS – U.S. 224, between Troy Township Road 791 and County Road 681, will close Monday, July 22 for a culvert replacement. The detour route will be U.S. 224 east to SR 511 north to SR 162 east to SR 58 south to U.S. 224, and reverse. Estimated completion: Friday, August 2, 2024
CRAWFORD
U.S. Route 30 resurfacing – U.S. 30, from SR 98 to just east of SR 602, will have single lane closures for a resurfacing project. Project work includes resurfacing and minor bridge work. Traffic will be maintained at all times. Estimated completion: December 2024
State Route 181 resurfacing – SR 181 in the village of Crestline, from SR 61 to Bucyrus Street, will have single lane closures for a resurfacing project. Traffic will be maintained by flaggers. Estimated completion: August 2024
State Route 598 resurfacing – SR 598, between the city of Galion and SR 39, will have single lane closures for a resurfacing project. Traffic will be maintained by flaggers. Estimated completion: August 2024
RICHLAND
State Route 96 bridge replacement – SR 96, between SR 603 and SR 545, is closed for 120 days for a bridge replacement project. The detour route will be SR 96 west to SR 545 south to SR 603 north to SR 96, and reverse. Estimated completion: Tuesday, August 20, 2024
State Route 430 culvert replacement – SR 430, at McElroy Rd, is closed for a culvert replacement. The detour route will be SR 430 east to SR 39 south to SR 603 north to SR 430, and reverse. Estimated completion: Friday, July 26, 2024